| The Epicor Kinetic Master Scheduler owns how the plant plans and schedules production in Epicor Kinetic. Configures and runs finite and advanced scheduling, maintains the data behind the schedule, and turns the schedule into a tool the shop floor trusts. Serves as the link between planning, production, purchasing, and IT, and is the go-to resource for scheduling in Kinetic: how jobs are loaded, why a date moved, and what to change so the plan matches reality. |
- Configure and maintain the Epicor Kinetic scheduling engine, including resource groups, resources, calendars, shifts, capacity, and scheduling blocks.
- Set up and tune finite and infinite scheduling, forward and backward scheduling, and constraint rules to reflect real plant capacity.
- Implement, configure, and support Epicor Advanced Planning and Scheduling (APS) where licensed, including constraint materials and multi-resource scheduling.
- Own the Global Scheduling process: when it runs, what it touches, and how its results are reviewed.
- Run and analyze MRP, review suggestions, and convert planned jobs into firm jobs with the planning team.
- Use the Job Scheduling Board, Multi-Resource Scheduling Board, Resource Scheduling Board, and Capacity Loading views to balance load and resolve bottlenecks.
- Partner with Purchasing and Inventory so material availability is reflected in schedule dates.
- Support customer delivery commitments by providing realistic promise dates and what-if scenarios.
- Maintain accurate Bills of Operations (routings), production standards, setup and run times, queue and move times, and operation-to-resource mappings.
- Audit part, method, and resource data on a regular cycle and correct issues that distort the schedule.
- Ensure labor and production reporting (MES, time entry) feeds back into the schedule accurately.
- Build and maintain BAQs, dashboards, and reports for load vs. capacity, schedule adherence, late jobs, and WIP.
- Present schedule status and capacity risks in daily or weekly production meetings.
- Train planners, supervisors, and Floor Leads on scheduling workflows and Kinetic screens.
- Write and maintain SOPs and work instructions for scheduling processes.
- Act as the subject matter expert for scheduling-related tickets, upgrades, and testing of new Kinetic releases.
- Communicate with appropriate persons immediately upon discovery of potential problems and work to solve problems promptly and logically.
- Lead continuous improvement efforts to cut lead times, reduce expediting, and raise on-time delivery.
- Other duties as assigned.
|